Document Description
The project is called "Day Avenue to Arden Way", but while the improvements begin at Day Avenue they stop about 600 feet away from Arden Way. The proposed project involves the construction of pedestrian facilities and improvements in sections where facilities are lacking along the southeastern side of Fair Oaks Boulevard; facilities are absent and will be installed in the section from Day Drive to Jardin Lane and then in the section from Day Drive to Jardin Lane and then in the section from Elsdon Circle to about 330 feet beyond Elsdon Circle. The project does not involve changes to the existing sidewalk, curb and gutter from Jardin Lane to Elsdon Circle, because facilities already exist in this section. The project involves clearing and grubbing, traffic control, pavement removal, sidewalk construction, curb and gutter installation, ADA ramp construction, drain inlet and pipe installation, minor pavement repair, roadway restriping and bicycle lane improvements. The project will include improvements to enhance pedestrian and bicyclist safety and mobility, as follows: the creation of a 4-foot bicycle lane, the construction of a 3-foot Type 2 curb and gutter and the construction of a 4-foot sidewalk.

Contact Information

Name
Catherine Hack
Agency Name
Sacramento County
Contact Types
Lead/Public Agency

Location

Counties
Sacramento
Cross Streets
Fair Oaks Blvd/Day Avenue
Zip
95608
Total Acres
.20
Schools
Various
Waterways
American River
Other Location Info
Carmichael

Notice of Determination

Approving Agency
County of Sacramento
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.