Sutter County / City of Marysville Boat Ramp Dredging Project
4 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2014012011
- Lead Agency
- Sutter County
- Document Title
- Sutter County / City of Marysville Boat Ramp Dredging Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 7/17/2014
- Present Land Use
- Road Right-of-Way, Open Space
- Document Description
- Sutter County, in coordination with the City of Marysville, is proposing maintenance of two boat ramps along the Feather River, just north of the fork with the Yuba River. Maintenance in the form of dredging is needed at these two locations because sediment has built up at the entrance to each boat ramp blocking boat access when the river level is low. Dredging these boat ramps will bring the facilities into compliance with the State Department of Boating and Waterways standards.
- Contact Information
-
Neal Hay
Sutter County
1130 Civic Center Blvd., Suite A
Yuba City, CA 95993
Phone : (530) 822-4402
Location
- Coordinates
- 39°7'8"N 121°36'1"W
- Cities
- Marysville Yuba City
- Counties
- Sutter Yuba
- Cross Streets
- 2nd Street in Yuba City and Biz Johnson Drive in Marysville
- Zip
- 95991
- Total Acres
- 3
- Parcel #
- Numerous
- State Highways
- Hwy 99/70
- Railways
- UPRR
- Airports
- Yuba City
- Waterways
- Coon Creek
- Township
- 13N
- Range
- 5E
- Section
- 32
Notice of Determination
- Approving Agency
- Sutter County
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- Sutter County Development Services Department, 1130 Civic Center Boulevard, Suite A, Yuba City, CA 95993
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.