Marysville Boat Ramp Dredging Project; Streambed Alteration Agreement # 1600-2014-0037-R2
4 Documents in Project
Summary
SCH Number
2014012011
Lead Agency
Sutter County
Document Title
Marysville Boat Ramp Dredging Project; Streambed Alteration Agreement # 1600-2014-0037-R2
Document Type
NOD - Notice of Determination
Received
Posted
7/17/2014
Present Land Use
Road Right-of-Way, Open Space
Document Description
The CA Dept. of Fish and Wildlife is executing Lake or Streambed Alteration Agreement number 1600-2014-0037-R2, pursuant to Section 1602 of the Fish and Game Code to the project applicant, City of Marysville.
The project is limited to dredging sediment from the Marysville Boat Ramp on the Feather River Dredging activities will be performed using an excavator and dredged materials will be deposited in dump trucks for disposal at an offsite location. A construction barrier, described below, will be used to create a sediment buffer between the active work area and the main river channel.
The project has been designed to occur when water levels are low, with water depths anticipated to be 0-6 feet deep. Prior to accessing the Feather River or initiating dredging activities, the project proposes to install a barrier to minimize turbidity within the main Feather River Channel.
Contact Information
Name
Tanya Sheya
Agency Name
CA Dept. of Fish & Wildlife
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Marysville, Yuba City
Counties
Sutter, Yuba
Cross Streets
2nd Street in Yuba City and Biz Johnson Drive in Marysville
Zip
95991
Total Acres
3
Parcel #
Numerous
State Highways
Hwy 99/70
Railways
UPRR
Airports
Yuba City
Waterways
Coon Creek
Township
13N
Range
5E
Section
32
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No