2014 Water Pollution Control Facility Improvements (Project); Clean Water State Revolving Fund (CWSRF) No. C-06-8002-110, 120, 130

4 Documents in Project

Summary

SCH Number
2014012009
Lead Agency
City of Woodland
Document Title
2014 Water Pollution Control Facility Improvements (Project); Clean Water State Revolving Fund (CWSRF) No. C-06-8002-110, 120, 130
Document Type
NOD - Notice of Determination
Received
Posted
10/8/2014
Present Land Use
Public Service/Open-Space
Document Description
The Project will convert the oxidation ditches to nitrifying and denitrifying bioreactors by installing partitions to separate the aerated and anoxic zones, and replace the surface brush aerators with submersible mixers and 9-inch membrane disc diffusers. An alkalinity feed facility and a new blower building will also be constructed. The blower building will have two rooms. The blower room will house the high-speed turbo blowers while the electrical room will house all electrical gears, motor control centers, programmable logic controllers and other equipment. This Project also will replace the existing bar screens with fine mechanical screens. The sludge treatment pond will be enhanced by installing additional piping and valves. These enhancements will allow operations staff to isolate each sludge treatment pond to allow dewatering and drying of sludge prior to disposal or reuse.

Contact Information

Name
Ahmad Kashkoli
Agency Name
State Water Resources Control Board
Contact Types
Lead/Public Agency

Location

Cities
Woodland
Counties
Yolo
Cross Streets
Road 24 / Road 102
Zip
95695
Total Acres
256
State Highways
Hwy 5, 113
Railways
UPRR
Waterways
Willow Slough

Notice of Determination

Approving Agency
State Water Board
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.