2014 Water Pollution Control Facility Improvements (Project); Clean Water State Revolving Fund (CWSRF) No. C-06-8002-110, 120, 130

4 Documents in Project

Summary

SCH Number
2014012009
Lead Agency
Woodland, City of (City of Woodland)
Document Title
2014 Water Pollution Control Facility Improvements (Project); Clean Water State Revolving Fund (CWSRF) No. C-06-8002-110, 120, 130
Document Type
NOD - Notice of Determination
Received

Document Description
The Project will convert the oxidation ditches to nitrifying and denitrifying bioreactors by installing partitions to separate the aerated and anoxic zones, and replace the surface brush aerators with submersible mixers and 9-inch membrane disc diffusers. An alkalinity feed facility and a new blower building will also be constructed. The blower building will have two rooms. The blower room will house the high-speed turbo blowers while the electrical room will house all electrical gears, motor control centers, programmable logic controllers and other equipment. This Project also will replace the existing bar screens with fine mechanical screens. The sludge treatment pond will be enhanced by installing additional piping and valves. These enhancements will allow operations staff to isolate each sludge treatment pond to allow dewatering and drying of sludge prior to disposal or reuse.

Contact Information
Ahmad Kashkoli
State Water Resources Control Board
1001 I Street 16th Floor
Sacramento, CA 95814

916-341-5855

Location

Coordinates
38°39'18"N 121°43'21"W
Cities
Woodland
Counties
Yolo
Cross Streets
Road 24 / Road 102
Zip
95695
Total Acres
256
State Highways
Hwy 5, 113
Railways
UPRR
Waterways
Willow Slough

Notice of Determination

Approving Agency
State Water Board
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
State Water Board, Division of Financial Assistance, 1001 I Street 16th Floor, Sacramento, CA 95814

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes