2014 Water Pollution Control Facility Improvements (Project); Clean Water State Revolving Fund (CWSRF) No. C-06-8002-110, 120, 130
4 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2014012009
- Lead Agency
- Woodland, City of (City of Woodland)
- Document Title
- 2014 Water Pollution Control Facility Improvements (Project); Clean Water State Revolving Fund (CWSRF) No. C-06-8002-110, 120, 130
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 7/30/2014
- Present Land Use
- Public Service/Open-Space
- Document Description
- The Project will convert the oxidation ditches to nitrifying and denitrifying bioreactors by installing partitions to separate the aerated and anoxic zones, and replace the surface brush aerators with submersible mixers and 9-inch membrane disc diffusers. An alkalinity feed facility and a new blower building will also be constructed. The blower building will have two rooms. The blower room will house the high-speed turbo blowers while the electrical room will house all electrical gears, MCCs, PLC controllers and other equipment. This Project also will replace the existing bar screens with fine mechanical screens. The sludge treatment pond will be enhanced by installing additional piping and valves. These enhancements will allow operations staff to isolate each sludge treatment pond to allow dewatering and drying of sludge prior to disposal or reuse.
- Contact Information
-
Christine Day
State Water Resources Control Board
1001 I Street 16th Floor
Sacramento, CA 95814
Phone : (916) 319-9440
Location
- Coordinates
- 38°39'18"N 121°43'21"W
- Cities
- Woodland
- Counties
- Yolo
- Cross Streets
- Road 24 / Road 102
- Zip
- 95695
- Total Acres
- 256
- State Highways
- Hwy 5, 113
- Railways
- UPRR
- Waterways
- Willow Slough
Notice of Determination
- Approving Agency
- State Water Board
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- State Water Board, Division of Financial Assistance at 1001 I Street 16th Floor, Sacramento, CA 95814
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.