Interstate 580 Roadway Rehabilitation Project, Endangered Species Act (CESA) Incidental Take Permit No. 2081-2015-039-03 (ITP)

6 Documents in Project

Summary

SCH Number
2014012001
Lead Agency
California Department of Transportation, District 4
Document Title
Interstate 580 Roadway Rehabilitation Project, Endangered Species Act (CESA) Incidental Take Permit No. 2081-2015-039-03 (ITP)
Document Type
NOD - Notice of Determination
Received
Posted
9/24/2018
Present Land Use
State Highway
Document Description
Caltrans proposed to rehabilitate the pavement of eastbound I-580, from the San Joaquin County Lin to one mile east of North Flynn Road and the mainline of Westbound I-580/I-205 from the San Joaquin County Line to Greenville off-ramp in Alameda County. A second distinct location occurs on I-580 between the Eden Canyon Road Undercrossing and the Strobridge Avenue Undercrossing in Alameda County. Rehabilitation of the pavement will include adding overhead safety signs, replacing dikes, concrete curbs, metal beam guardrails, and concrete barriers, placement of shoulder backing, embankment reconstruction, adjusting existing drainage inlets to grade, replacing bridge approach slabs, and adding polyester concrete overlay on Midway Road Undercrossing and California Aqueduct Bridge. The project will also meter and rehabilitate 12 existing on-ramps, two of which will be widened to provide for a High Occupancy vehicle preferential lane or Mixed Flow Lane, Maintenance Vehicle Pullouts and CHP pullouts.

Contact Information

Name
Robert Stanley
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Cities
Livermore
Counties
Alameda
Cross Streets
Greenville Rd Westboudn off-ramp, Patterson Pass Rd Overcrossing, Strobridge Avenue
State Highways
I-580
Other Information
Post mile 8.5; Post mile 0.0 to 1.0; post mile 26.1; Post mile 30.3

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print