Well No. 102 - Wellhead Treatment Facilities (Project No. D1723)

2 Documents in Project

Summary

SCH Number
2014011062
Lead Agency
Rancho California Water District
Document Title
Well No. 102 - Wellhead Treatment Facilities (Project No. D1723)
Document Type
NOD - Notice of Determination
Received

Document Description
The District Proposed Project will replace a motor, a pump, and install a granular activated carbon treatment system. The district will also install a sodium hypochlorite generation and feed system, a manganese treatment system, and a bolted steel backwash settling tank. Well 102 will be reconnected and reactivated to produce 800-gpm for potable water. (Well 102 was originally used for potable water and then replumbed as recycled water.) The treatment facilities will be connected to the water distribution system by an existing pipeline that runs form the treatment facilities across District land to a 30-inch diameter pipeline in Diaz Road. The existing well, electrical panels, and chlorine building as well as the existing monitoring well and extensometer are planned to remain in place. The iron and manganese precipitate sludge will be trucked to a properly licensed disposal facility. The project will provide for the operation of the facilities.

Contact Information
J. Steven Williams
State Water Resources Control Board
1350 Front Street, Room 2050
San Diego, CA 92101

619.525.4159

Location

Coordinates
33°30'10"N 117°9'39"W
Cities
Temecula
Counties
Riverside
Zip
92590
Total Acres
.25
Parcel #
921-040-006
State Highways
I-15 and SR 79
Waterways
Murrieta Creek
Township
8S
Range
3W
Section
2
Base
SBB&M
Other Location Info
28061 Diaz Road

Notice of Determination

Approving Agency
State Water Board
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
1350 Front Street, Room 2050, San Diego CA 92101

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A Statement of Overriding Considerations was adopted for this project
Yes
(5) Findings were made pursuant to the provisions of CEQA
No