Liberty Packing Expansion Project, Major Modif. MM13-017 to Conditional Use Permit No. CUP02-001
2 Documents in Project
Summary
SCH Number
2014011039
Lead Agency
Merced County
Document Title
Liberty Packing Expansion Project, Major Modif. MM13-017 to Conditional Use Permit No. CUP02-001
Document Type
NOD - Notice of Determination
Received
Posted
3/17/2014
Present Land Use
A-1 General Agriculture
Document Description
To expand an existing tomato processing and packing facility to permit 1) expanding an existing cooling pond from 60 acres to 140 acres. 2) Expand an existing settling pond from 1.25 to 2.5 acres. 3) Addition of 9,000 sf. to an existing product filling and packaging building. 4) Construction of 5 small utility sheds. 5) Addition of an evaporator. 6) An additional Boiler. 7) An additional 120 loaded tomato truck trips per day during peak season (July-November). 8) Adding 12 acres of open product storage to the existing 43 acres. 9) Addition of a railroad spur with associated loading docks. 10) Adding a 65,000 sf. pole shed to cover existing outdoor storage. 11) Future mounded septic leach mound system replacement area.
Contact Information
Name
Oksana Newmen
Agency Name
Merced County Community and Economic Development Department
Contact Types
Lead/Public Agency
Address
Phone
Location
Coordinates
Counties
Merced
Cross Streets
Henry Miller Ave. and South Ingomar Grade Rd.
Zip
93635
Total Acres
100
Parcel #
070-112-003, 004, 012
Waterways
San Luis Wasteway
Township
9S
Range
9E
Section
36
Base
MDB&M
Other Location Info
Volta
Notice of Determination
Approving Agency
County of Merced
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.