Son Shine Properties Proposition 84 Project (Project)

3 Documents in Project

Summary

SCH Number
2014011031
Lead Agency
Arvin Community Services District
Document Title
Son Shine Properties Proposition 84 Project (Project)
Document Type
NOD - Notice of Determination
Received
Posted
7/8/2020

Document Description
The State Water Resources Control Board (State Water Board) is a Responsible Agency for the Project. The State Water Board’s Drinking Water State Revolving Fund (SRF) Program is financing the Project. The Project includes a 12-inch, approximately 7,920-feet mainland extension pipeline, from the District’s existing system at Comanche Drive and Sunset Blvd to the Son Shine Properties Water System. The water system consolidation will include installation of new fire hydrants, gate valves, air release valves, and metered services along the pipelines. In addition, the Project will involve a welded steel storage tank, hydropneumatics tank, booster pumping station, site piping, electrical controls, site fencing, and landscaping to lift the water from the District system to the Son Shine Properties area.

Contact Information
Bridget Binning
State Water Resources Control Board
Board 1400 Tenth Street, Room 113 1001 I Street
Sacramento, CA 95814

Phone : (916) 449-5641

Location

Cities
Arvin
Counties
Kern
Other Location Info
The Project is located at the cross streets of Comanche Drive and DiGorgio Road, City of Arvin, within Kern County.

Notice of Determination

Approving Agency
State Water Board
Approving Agency Role
Responsible Agency
Approved On
Final Environmental Document Available at
State Water Board, Division of Financial Assistance at 1001 I Street, 16th Floor, Sacramento, CA 95814. The Mitigated Negative Declaration is available from the Lead Agency.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Notice of Determination
2014011031_Son Shine Properties   PDF 135 K

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print