Sonshine Properties Proposition 84 Project

3 Documents in Project

Summary

SCH Number
2014011031
Lead Agency
Arvin Community Services District
Document Title
Sonshine Properties Proposition 84 Project
Document Type
NOD - Notice of Determination
Received
Posted
2/28/2014
Present Land Use
Exclusive Agriculture/Intensive Agriculture
Document Description
The project will involve a mainline extension from the existing ACSD system at Comanche Drive and Sunset Blvd to the Son Shine Properties Water System. This will be a 12-inch C900 PVC pipeline and be installed on the east side Comanche Drive for approximately 7,920 ft, then cross Comanche Drive westerly, and continue north on the west side of Comanche Drive for approximately 3,400 ft and include a cased road crossing at DiGiorgio Road. A 12-inch C900 PVC pipeline will branch to the west from this mainline extension and be installed along the northside of DiGiorgio Road to approximately 3,500 ft west of Comanche Road. This water system consolidation will include installation of new fire hydrants, gate valves, air release valves, and metered services along the PVC pipelines.

Contact Information

Name
Fernando Pantoja
Agency Name
Arvin Community Services District
Contact Types
Lead/Public Agency

Location

Cities
Arvin
Counties
Kern
Cross Streets
Comanche Drive and DiGiorgio Road
Zip
93203
Total Acres
2
Schools
Arvin HS
Township
31
Range
29
Section
2/3/10
Base
MDB&M

Notice of Determination

Approving Agency
Arvin Community Services District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print