Avalon Green Alley South

Summary

SCH Number
2013128337
Public Agency
City of Los Angeles
Document Title
Avalon Green Alley South
Document Type
NOE - Notice of Exemption
Received
Posted
12/23/2013
Document Description
The project proposes the installation of three (3) storm water best management practices (BMPs) in the alley to capture, infiltrate, and retain storm water runoff. The project will use permeable pavers, dry well/catch basins, and rainwater harvesting for plant irrigation. The project will remove pollutants such as pathogens, oils, greases, suspended solids, metals, and other toxics that will assist in meeting the Los Angeles River Total Maximum Daily Load (TDL) requierments. Besides the BMP, the project will install six (6) solar or City Electrically Powered lighting fixtures. Entry and interpretive signage will be installed off of San Pedro street and at the entry point adjacent to 131 E 54th Street. Seventy-to inch (72") high bollards, spaced at 6' apart will be installed to support growing espallered fruit trees within some of the community planting areas.

Contact Information

Name
James Tebbetts
Agency Name
City of Los Angeles CIty Engineer
Contact Types
Lead/Public Agency

Location

Counties
Los Angeles

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
15301(c), Class 1
Reasons for Exemption
Minor alteration of an existing alley into a 'green alley.'

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print