State Route 85 Express Lanes Project
5 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2013122065
- Lead Agency
- Caltrans 4 (Oakland) (California Department of Transportation, District 4)
- Document Title
- State Route 85 Express Lanes Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 4/30/2015
- Present Land Use
- State highway right-of-way
- Document Description
- The California Department of Transportation (Caltrans), in cooperation with the Santa Clara Valley Transportation Authority (VTA), proposes to convert the existing High-Occupancy Vehicle (HOV) lanes on State Route (SR) 85 to express lanes and add a second express lane in both directions between SR 87 and Interstate 280 (I-280). The express lanes would extend along the entire 24.1 mile length of SR 85 and 1.5 miles of US Hwy 101 from the southern end of SR 85 to Metcalf Road in San Jose. The total project length is 33.7 miles.
- Contact Information
-
Cristin Hallissy
California Department of Transportation, District 4
111 Grand Avenue
Oakland, CA 94612-0660
Phone : (510) 622-8717
Location
- Counties
- Santa Clara
- Zip
- Multiple
- State Highways
- Hwy 237, 280, 17,. 87, 101
- Airports
- San Jose Int'l
- Waterways
- Guadalupe River, Stevens Creek, Coyote Creek, others
- Other Location Info
- Multiple
Notice of Determination
- Approving Agency
- Caltrans
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- Caltrans District 4, 111 Grand Avenue, Oakland, CA 94612 Santa Clara Valley Transportation Authority
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- No
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.