Final Initial Study/Mitigated Negative Declaration and Addendum for the Los Carnero Recycled Water Pipeline Project

7 Documents in Project

Summary

SCH Number
2013122043
Lead Agency
Los Carneros Water District
Document Title
Final Initial Study/Mitigated Negative Declaration and Addendum for the Los Carnero Recycled Water Pipeline Project
Document Type
NOD - Notice of Determination
Received
Posted
4/3/2015
Present Land Use
Agriculture/Residential/Roadway
Document Description
The larger project includes installing a new 8.5 mile recycled water pipeline in the Los Carneros region of Southwest Napa County. The project within the jurisdiction of this Agreement is limited to: 1) Installing a 16-inch diameter steel pipe with two concrete pipe supports and drilled piers on each bank. 2) Installing a 16-inch diameter PVC pipe within a 30-inch steel casing at least one foot below the stream bed using a jack and bore method for a distance of approximately 80-feet under an unnamed tributary. The California Department of Fish and Wildlife is executing a Lake and Streambed Alteration Agreement Number 1600-2014-0416-3 pursuant to Section 1602 of the Fish and Game Code to the project Applicant, Andrew Damron, Napa Sanitation District.

Contact Information

Name
Suzanne Gilmore
Agency Name
CDFW Bay Delta Region
Contact Types
Lead/Public Agency

Location

Cities
Napa
Counties
Napa
Cross Streets
Hwy 29 and Hwy 121
Zip
94559
State Highways
Hwy 29 and 121
Waterways
Napa River

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.