Recycled Water Pipeline (Project);

7 Documents in Project

Summary

SCH Number
2013122043
Lead Agency
Los Carneros Water District
Document Title
Recycled Water Pipeline (Project);
Document Type
NOD - Notice of Determination
Received
Posted
1/23/2015
Present Land Use
Agriculture/Residential/Roadway
Document Description
The Project consists of the installation of 9.2 miles of recycled water pipeline approximately six (6) to 20 inches in diameter to serve areas of the 3,800 acres of residential landscape and agricultural land within the District. The pipeline network will be constructed within existing roadways. The construction of new pipelines includes excavation, pipe placement, backfilling, and the restoration of roads damaged by construction. Excavated materials resulting from site preparation would either be used on-site during construction or disposed of at a fill area authorized by the Napa County Department of Public Works. The Project will serve approximately 3,800 acres of irrigable land within the District with a recycled water supply of approximately 1,300 acre-feet per year (AFY) that meets Title 22 unrestricted use requirements. Recycled water users within the District will connect their own pipeline, irrigation systems, and facilities to provide the recycled water to their private lands and fields.

Contact Information

Name
Cedric S. Irving
Agency Name
State Water Resources Control Board
Contact Types
Lead/Public Agency

Location

Cities
Napa
Counties
Napa
Cross Streets
Hwy 29 and Hwy 121
Zip
94559
State Highways
Hwy 29 and 121
Waterways
Napa River

Notice of Determination

Approving Agency
State Water Resources Control Board
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.