Pacific Gas and Electric Humboldt Bay Power Plant Canal Remediation Project (California Endangered Species Act Incidental Take Permit No. 2081-2014-029-07 (ITP)

2 Documents in Project

Summary

SCH Number
2013122032
Lead Agency
Humboldt Bay Harbor
Document Title
Pacific Gas and Electric Humboldt Bay Power Plant Canal Remediation Project (California Endangered Species Act Incidental Take Permit No. 2081-2014-029-07 (ITP)
Document Type
NOD - Notice of Determination
Received
Posted
7/16/2014
Present Land Use
Z: Coastal Dependent Industrial (MC)/GPD: Resource Dependent / Industrial (MC/MR)
Document Description
Project involves the removal of sediments contaminated with radionuclides and other contaminants from the intake and discharge canals of the former Humboldt Bay Nuclear Power Plant to enable termination of the facility's Nuclear Regulatory Commission license. The Project also includes the demolition of intake and discharge control structures and the permanent disconnection of the discharge canal from Humboldt Bay. Mitigation of project impacts will be completed onsite utilizing the intake canal and an adjacent parking lot. The Project will result in 1.94 acres of coho salmon (Oncorhynchus kisutch) and longfin smelt (Spirinchus thaleichthys) habitat including temporary impacts to 1.15 acres; the project will permanently remove 0.79 acres of coho salmon and longfin smelt habitat. The project is expected to result in incidental take of coho salmon and longfin smelt, which is/are designated as a threatened under the CA Endangered Species Act. The ITP referenced above as issued by the CDFW authorizes incidental take of species listed under CESA that may occur as a result of Project implementation.

Contact Information

Name
Craig Shuman
Agency Name
CA Dept. of Fish and Wildlife
Contact Types
Lead/Public Agency

Location

Cities
Eureka
Counties
Humboldt
Cross Streets
King Salmon Avenue and US 101
Zip
95503
Total Acres
143
Parcel #
305-131-34
State Highways
Hwy 101
Airports
No
Schools
South Bay ES
Waterways
Humboldt Bay, Buhne Slough
Township
4N
Range
1W
Section
8
Base
HB&M
Other Location Info
King Salmon

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print