Bridgeport Culverts Replacement Project (Streambed Alteration Agreement No. 1600-2015-0099-R6)

4 Documents in Project

Summary

SCH Number
2013122027
Lead Agency
California Department of Transportation, District 6
Document Title
Bridgeport Culverts Replacement Project (Streambed Alteration Agreement No. 1600-2015-0099-R6)
Document Type
NOD - Notice of Determination
Received
Posted
10/28/2015
Present Land Use
Recreation, Agricultural, Resource Management
Document Description
CDFW is executing streambed alteration agreement no 1600-2015-0099-R6, pursuant to section 1602 of the fish and game code to the permittee, Caltrans, as represented by Mr. Javier Almaguer. The for the Bridgeport Culverts Replacement Project, the Permittee is proposing to excavate and replace 18 existing culverts with larger culverts, replace 22 culverts without expanding of the capacity of the culvert, install flared-end-sections at 27 locations, and place rock-slope-protection at seven locations. Access to work areas will occur along the existing highway, and no equipment shall operate outside of Caltrans-right-of-way. A diversion/dewatering plan has been submitted to CDFW in the event that surface water or ground water is encountered. Equipment staging and maintenance areas will be located on pavement or existing dirt pullouts. The project will result in permanent impacts to 0.02 acres of CDFW jurisdictional streambed and temporary impacts to 0.1 acres of CDFW jurisdictional streambed.

Contact Information

Name
Heidi Calvert
Agency Name
CDFW Inland Desert
Contact Types
Lead/Public Agency

Location

Counties
Mono
Cross Streets
U.S. 395/Green Creek and U.S. 395 / Swauger Lane
Zip
93517
State Highways
U.S. 395
Airports
Bryant Field Airport
Schools
Bridgeport ES
Waterways
Swauger Creek, East Walker River, Virginia Creek
Other Location Info
Bridgeport

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print