Seawall Lot 337 and Pier 48 Mixed Use Project
3 Documents in Project
Summary
SCH Number
2013122024
Lead Agency
City and County of San Francisco
Document Title
Seawall Lot 337 and Pier 48 Mixed Use Project
Document Type
NOD - Notice of Determination
Received
Posted
3/12/2018
Present Land Use
Seawall Lot 337: MB-OS (Mission Bay, Open Space), OS Height & Bulk Dist; Pier 48: M-2 (Heavy Industrial), 40-X Height & Bulk
Document Description
The Seawall Lot 337 and Pier 48 Mixed-Use Project rezones the entire approx. 28-acre project site and establishes land use controls for the project site through adoption of the Mission Rock Mixed Use District and Mission Rock Special Use District (SUD), and incorporation of a design standards and guidelines in Design Controls. The project entails development of a mixed-use, multi-phase project at Seawall Lot 337 and Parcel P20, rehabilitation and reuse of Pier 48, and construction of approx. 5.4 acres of net new open space, for a total of approx. 8 acres of open space on the project site. The project will include up to 2.7 to 2.8 million gsf. of mixed uses on 11 development blocks. The mixed-use development will comprise approx. 1.1 to 1.6 million gsf of residential uses (estimated at 1,000 to 1,600 units, 40% of which would be designated as below market rate), approx. 972,000 to 1.4 million gsf of commercial/office uses, and 241,000 to 244,800 gsf of active/retail and production uses on the lower floors of each block. Additionally, the project will include up to approx. 1.1 million gsf of above- and below-ground parking (approx. 3,000 spaces) in one or two centralized garages; 100 additional parking spaces would be allowed throughout the remaining parcels on the site. also as part of the project, 242,500 gsf at Pier 48 would be rehabilitated for industrial, restaurant, active/retail, tour, exhibition, and/or meeting space use. consistent with the voter approved Proposition D (November 2015), the 11 blocks on Seawall Lot 337 will be developed with building heights ranging from 90 feet to a maximum of 240 feet for the tallest building, excluding the mechanical and other accessory penthouse roof enclosures and unoccupied building tops, subject to specified standards.
Contact Information
Name
Tania Sheyner
Agency Name
City and County of San Francisco
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
San Francisco
Counties
San Francisco
Cross Streets
Third Street/Terry A. Francois Blvd./Mission Rock Street/Piers 48 and 50/Parcel 20
Zip
94158
Total Acres
~26.98
Parcel #
8719/002,9900/048,8719/002
State Highways
I-280, I-80, US 101
Railways
Caltrain
Schools
Several
Waterways
San Francisco Bay, Mission Creek
Township
2S
Range
5W
Notice of Determination
Approving Agency
City and County fo San Francisco
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.