Bunker Hill Road Bridge Replacement
3 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2013122014
- Lead Agency
- Amador County
- Document Title
- Bunker Hill Road Bridge Replacement
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 1/16/2014
- Present Land Use
- Rural Residential/R1A-Single Family Residential and Agricultural/Residential-Suburban
- Document Description
- Amador County proposed to replace the existing two-lane Bunker Hill Road Bridge (Bridge No. 26C-0043) (proposed project) in Amador County with a new two-lane bridge. The bridge crosses Rancheria Creek, a tributary of Dry Creek. The new bridge will be constructed adjacent to the western edge of the existing bridge. The span of the new bridge would be approximately 60 feet long (20 feet longer than the existing bridge), and 26 feet wide. The approach roadway would be realigned up to 270 feet on both sides of the bridge. The realigned roadway would accommodate two 11-foot-wide travel lanes and two 2-foot-wide shoulders.
- Contact Information
-
Aaron Brusatori
Amador County Transportation and Public Works
Lead/Public Agency
810 Court Street
Jackson, CA 95642
Phone : (209) 223-6429
Location
- Cities
- Amador City
- Counties
- Amador
- Cross Streets
- Bunker Hill and Fremont Mine roads
- Zip
- 95601
- State Highways
- Hwy 49
- Waterways
- Rancheria Creek
Notice of Determination
- Approving Agency
- Amador County Board of Supervisors
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- Amador County Department Transportation & Public Works 810 Court Street, Jackson CA 95642
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.