Bunker Hill Road Bridge Replacement
3 Documents in Project
Summary
SCH Number
2013122014
Lead Agency
Amador County
Document Title
Bunker Hill Road Bridge Replacement
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
Rural Residential/R1A-Single Family Residential and Agricultural/Residential-Suburban
Document Description
Amador County proposed to replace the existing two-lane Bunker Hill Road Bridge (Bridge No. 26C-0043) (proposed project) in Amador County with a new two-lane bridge. The bridge crosses Rancheria Creek, a tributary of Dry Creek. The new bridge will be constructed adjacent to the western edge of the existing bridge. The span of the new bridge would be approximately 60 feet long (20 feet longer than the existing bridge), and 26 feet wide. The approach roadway would be realigned up to 270 feet on both sides of the bridge. The realigned roadway would accommodate two 11-foot-wide travel lanes and two 2-foot-wide shoulders.
Contact Information
Name
Barbara Belvoir
Agency Name
Amador County Transportation and Public Works
Contact Types
Lead/Public Agency
Phone
Location
Cities
Amador City
Counties
Amador
Cross Streets
Bunker Hill and Fremont Mine roads
Zip
95601
State Highways
Hwy 49
Waterways
Rancheria Creek
Notice of Completion
State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Department of Fish and Wildlife, North Central Region 2 (CDFW), California Department of Parks and Recreation, California Department of Transportation, District 10 (DOT), California Highway Patrol, California Native American Heritage Commission (NAHC), California State Lands Commission (SLC), Central Valley Flood Protection Board, Department of Toxic Substances Control, Department of Water Resources, Office of Historic Preservation, Resources Agency, California Regional Water Quality Control Board, Central Valley Sacramento Region 5 (RWQCB)
State Reviewing Agency Comments
California Regional Water Quality Control Board, Central Valley Sacramento Region 5 (RWQCB)
Development Types
Transportation:Other (Bridge Replacement)
Local Actions
Bridge Replacement
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Drainage/Absorption, Economics/Jobs, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Sewer Capacity, Solid Waste, Transportation, Vegetation, Wetland/Riparian
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.