Orange County Distribution System Infrastructure Protection Program (DISPP)

4 Documents in Project

Summary

SCH Number
2013121060
Lead Agency
Metropolitan Water District of Southern California
Document Title
Orange County Distribution System Infrastructure Protection Program (DISPP)
Document Type
NOD - Notice of Determination
Received
Posted
4/14/2016
Present Land Use
Various for the multiple locations.
Document Description
Metropolitan prepared a Program EIR for the Orange County DSIPP in compliance with CEQA and the State CEQA Guidelines. The proposed program described in the PEIR consists of a comprehensive program to design and construct projects addressing surface infrastructure repair and protection needs, while simultaneously implementing a plan for conducting routine operations and maintenance (O&M) activities in the Orange County Operating Region. The scope of the program does not include projects related to the subsurface infrastructure (i.e., pipelines). The proposed Capital Investment Plan (CIP) projects generally consist of repair, upgrade, and/or relocation of existing structures, or the installation of structures to address access or infrastructure problems that threaten reliability.

Contact Information

Name
Jennifer Harriger
Agency Name
Metropolitan Water District of Southern California
Contact Types
Lead/Public Agency

Location

Cities
Chino Hills, Orange
Counties
Orange, Riverside, San Bernardino
Regions
Countywide
Parcel #
Multiple
State Highways
Multiple
Railways
Multiple
Airports
John Wayne
Schools
Multiple
Waterways
Multiple

Notice of Determination

Approving Agency
Metropolitan Water District of Southern CA
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print