Groundwater Extraction Wells 94, 95 & 96 and Appurtenances Project

2 Documents in Project

Summary

SCH Number
2013121014
Lead Agency
Eastern Municipal Water District (EMWD)
Document Title
Groundwater Extraction Wells 94, 95 & 96 and Appurtenances Project
Document Type
NOD - Notice of Determination
Received
Posted
2/27/2014
Present Land Use
Agricultural and Vacant/RR/MDR
Document Description
EMWD intends to install up to seven ground water extraction wells in the Perris South, Perris North, and Lakeview/Hemet North Groundwater Management Zones, to generate additional potable water supplies, reduce brackish water migration and remove excess salts and nutrients from the basins. Currently, Eastern proposes to install three ground water extraction Wells numbered 94, 95, and 96, associated appurtenances, and brackish water pipelines to connect each of the wells to existing brackish water pipelines. Each extraction well would consist of 16 to 18-inch diameter well casing extending between 350 to 500-feet below ground surface. The wellhead facilities may include a well pump foundation, pump, and motor; a building housing electrical and chemical facilities, blowoff pond, discharge pipeline and appurtenances. The extraction well site perimeter would be secured by a chain link fence or a block wall as appropriate to the surrounding land use.

Contact Information

Name
Helen Stratton
Agency Name
Eastern Municipal Water District
Contact Types
Lead/Public Agency

Location

Counties
Riverside
Cross Streets
Nuevo Road and Reservoir Avenue/Santa Rosa Road and Antelope Road
Zip
92567
Waterways
San Jacinto River
Township
4S
Range
3W
Section
24/35
Base
SBB&M
Other Location Info
Nuevo

Notice of Determination

Approving Agency
Eastern Municipal Water District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No