Mindego Ranch Use and Management Plan

2 Documents in Project

Summary

SCH Number
2013112067
Lead Agency
Midpeninsula Regional Open Space District
Document Title
Mindego Ranch Use and Management Plan
Document Type
NOD - Notice of Determination
Received
Posted
1/24/2014
Present Land Use
LU: Open space, Public Recreation, and Timber Production Z: RM, RM-CZ/CD, TPZ
Document Description
The proposed Use and Management Plan would direct future land management, operations, and public access actions and activities at Mindego Ranch. The goal of the U&M Plan is to protect and enhance habitat for sensitive wildlife species, while responsibly integrating land management activities and limited public access at Mindego Ranch. Specific project components include habitat enhancement actions (including eradicating non-native fish and bullfrogs, increasing capacity of smaller ponds, and installing livestock exclusion fencing); establishing conservation grazing (which includes installation of feeding/water facilities and implementation of water quality protection measures); providing minimal public access (including opening a new trail sections); and maintenance/operations projects (including erosion treatment and structure removal).

Contact Information

Name
Lisa Bankosh
Agency Name
Midpeninsula Regional Open Space District
Contact Types
Lead/Public Agency

Location

Cities
Woodside
Counties
San Mateo
Cross Streets
Alpine Road and Skyline Blvd (SR 35)
Zip
94062
Total Acres
1047
Parcel #
Multiple
State Highways
Hwy 35, 84
Schools
La Honda ES
Waterways
Mindego Creek, Alpine Creek
Township
7S
Range
3W
Section
3
Other Location Info
La Honda

Notice of Determination

Approving Agency
Midpeninsula Regional Open Space District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print