NCRSP Antelope Creek Flood Control Project

5 Documents in Project

Summary

SCH Number
2013112064
Lead Agency
Placer County Flood Control And Water Conservation
Document Title
NCRSP Antelope Creek Flood Control Project
Document Type
NOD - Notice of Determination
Received
Posted
6/1/2016
Present Land Use
LUD: Open Space, Community Commercial, and Parks and Recreation

Document Description
The applicant requested a Flood Encroachment Permit and a Tree Permit associated with a project consisting of multiple components, including a weir and modified culvert, rock slope protection, soil borrow, and restoration activities, the primary purpose of which is to detain additional flood volume within the creek corridor, which will reduce downstream peak discharges along the main stem of Dry Creek though downtown Roseville and portions of the Placer and Sacramento Counties. The project includes activities at various locations along the portion of Antelope Creek that lies between Atlantic Street and Antelope Creek Drive.

Contact Information
Lauren Hocker
City of Roseville
311 Vernon Street
Roseville, CA 95678

Phone : (916) 774-5272

Location

Coordinates
38°45'45.7"N 121°15'37.9"W
Cities
Roseville
Counties
Placer
Cross Streets
along Antelope Creek between SR65/Roseville Bypass and Atlantic St.
Zip
95678
Total Acres
41.18
Parcel #
various
State Highways
SR 65 and I-80
Railways
UPRR
Waterways
Antelope Creek

Notice of Determination

Approving Agency
City of Roseville
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
311 Vernon Street, Roseville, CA 95678

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print