Notice of Determination for Permit No. 19729 Dry Creek Greenway East Trail: Construction of Cirby Creek Bridge (Bridge 4)

10 Documents in Project

Summary

SCH Number
2013112042
Lead Agency
City of Roseville
Document Title
Notice of Determination for Permit No. 19729 Dry Creek Greenway East Trail: Construction of Cirby Creek Bridge (Bridge 4)
Document Type
NOD - Notice of Determination
Received
Posted
6/29/2023
Document Description
Approval of Permit No. 19729, under California Code of Regulations, Title 23, Article 3, Section 6, for work within an adopted plan of flood control: To authorize features associated with Phase 1 of the Dry Creek Greenway East Trail (DCGET) Project, including: constructing a 155-foot-long pedestrian steel bridge (Bridge No. 4) crossing Cirby Creek with rock slope protection at the new bridge abutments; and constructing approximately one mile of a new paved multi-use off-street trail with retaining walls, riprap, undercrossing, and storm drains with outfalls along the left bank of Cirby Creek. Temporary water diversions will be needed for construction.

Contact Information

Name
Greg Hendricks
Agency Name
CVFPB
Job Title
Senior Environmental Scientist
Contact Types
Responsible Agency

Location

Cities
Roseville
Counties
Placer
Regions
Northern California
Other Location Info
The project is located along left bank of Cirby Creek from the junction with Dry Creek to the junction with Linda Creek, within the City of Roseville, at 38.73351°N 121.28775°W, Cirby Creek, Placer County.

Notice of Determination

Approving Agency
Central Valley Flood Protection Board
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Placer
Final Environmental Document Available at
The EIR, prepared by the lead agency for the project, is available to the general public at the lead agency’s office listed above. The Board’s administrative record related to the encroachment permit is available for public review at the Board’s office.

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print