State Route 49 Drainage Improvement Project (Lake or Streambed Alteration Agreement No. 1600-2014-0298-R2).

4 Documents in Project

Summary

SCH Number
2013112018
Lead Agency
California Department of Transportation, District 3
Document Title
State Route 49 Drainage Improvement Project (Lake or Streambed Alteration Agreement No. 1600-2014-0298-R2).
Document Type
NOD - Notice of Determination
Received
Posted
3/26/2015
Present Land Use
Highway
Document Description
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement number 1600-2014-0298-R2, pursuant to section 1602 of the Fish and Game Code to the project Applicant, California Department of Transportation. The project will install 394 linear feet (LF) of reinforced concrete pipe (RCP), three new drainage inlets (DI's), and construct new asphalt curb and gutters to direct water flow. All work will be performed within Caltrans existing right-of-way. The RCP inlet will be at the southern extent of the project area where water will be directed into a 30" RCP that will pass through one DI. At this DI the RCP will increase to a 29" by 45" oval RCP that will then pass through the second DI and terminate at the third DI. The DIs will also tie in three cross culverts that cross under the highway, carrying runoff from west to east. Asphalt gutter will be placed from the highway shoulder over the new RCP.

Contact Information

Name
Juan Lopez Torres
Agency Name
CDFW North Central Region
Contact Types
Lead/Public Agency

Location

Cities
Placerville
Counties
El Dorado
State Highways
Hwy 49

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print