Concurrence with the issuance of a new Solid Waste Facilities Permit (SWFP) for the Active Recycling Material Recovery Facility and Transfer Station in the City
7 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2013111058
- Lead Agency
- Los Angeles, City of (City of Los Angeles)
- Document Title
- Concurrence with the issuance of a new Solid Waste Facilities Permit (SWFP) for the Active Recycling Material Recovery Facility and Transfer Station in the City
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 7/25/2014
- Present Land Use
- M-2 Light Industrial Zone/Light Manufacturing
- Document Description
- The proposed facility will be a large volume transfer/processing facility accepting municipal solid waste, green waste, and construction and demolition and inert debris and will operate within the following design/operation parameters: Hours of Operation - 6:00AM to 5:30PM Monday through Sunday; Maintenance Hours - 24 hours per day Monday through Sunday; Permitted Tonnage - 250 tons per day; and Permitted Area 0.56 acres. The facility is an existing recycling and buy-back center.
- Contact Information
-
Martin Perez
CalRecycle
PO Box 4025
Sacramento, CA 95812-4025
Phone : (916) 323-0834
Location
- Coordinates
- 33°59'15.2"N 118°18'49.4"W
- Cities
- Los Angeles Los Angeles, City of
- Counties
- Los Angeles
- Cross Streets
- Gramercy Place and Wilton Place
- Zip
- 90047
- Total Acres
- 3.56
- Parcel #
- 6001001001
- State Highways
- Rt 110
- Railways
- 1
- Schools
- 18
- Township
- 2S
- Range
- 14W
- Section
- 23
- Base
- SBB&M
Notice of Determination
- Approving Agency
- CalRecycle
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- Custodian of Records, CalRecycle, Attn: Legal Office, 1001 I Street, PO Box 4025, Sacramento, CA 95812-4025
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- N/A
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.