The Oaks

2 Documents in Project

Summary

SCH Number
2013111051
Lead Agency
San Juan Capistrano, City of (City of San Juan Capistrano)
Document Title
The Oaks
Document Type
NOD - Notice of Determination
Received

Document Description
The proposed project consists of a 32-lot subdivision for single-family detached residential homes, and modifications to an existing commercial equestrian facility on a 20.25 acre project site. The residential subdivision would feature 10,000 sf minimum lot sizes on an 11.79 acre project site. The equestrian facility would be reduced to 8.46 acres and maximum 50 horse stalls (100 existing), and would continue to offer equestrian training and boarding. Some of the existing equestrian structures would be demolished and approximately 296 trees would be removed 15 trees relocated on-site. Three new structures are proposed within the equestrian facility, including an employee casita, ranch house, and barn. Stormwater drainage will be treated with bio-swales and on-site infiltration. After the stormwater pollutants are treated via the bio-swales and on-site infiltration features, on-site stormwater runoff would be conveyed by connecting new on-site storm drain pipes to two existing storm drain pipes which discharge into San Juan Creek.

Contact Information
Nick Taylor
City of San Juan Capistrano
32400 Paseo Adelanto
San Juan Capistrano, CA 92675

949 443 6327

Location

Coordinates
33°30'52"N 117°37'51"W
Cities
San Juan Capistrano
Counties
Orange
Cross Streets
Oretga Highway and Avenida Siega
Zip
92675
Total Acres
20.25
Parcel #
664-041-07, -08, -09, -10
State Highways
SR-74
Railways
SORRA
Schools
San Juan Hills HS
Waterways
San Juan Creek

Notice of Determination

Approving Agency
City of San Juan Capistrano
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
32400 Paseo Adelanto, San Juan Capistrano CA

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search