Mission Creek Flood Control and Restoration Project (Lake or Streambed Alteration Agreement No. 1600-2014-0003-R3)

3 Documents in Project

Summary

SCH Number
2013102049
Lead Agency
Alameda County Water District
Document Title
Mission Creek Flood Control and Restoration Project (Lake or Streambed Alteration Agreement No. 1600-2014-0003-R3)
Document Type
NOD - Notice of Determination
Received
Posted
11/10/2014
Present Land Use
Park Open Space, O-S District

Document Description
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement number 1600-2014-0003-R3, pursuant to section 1602 of the Fish and Game Code to the project Applicant, Kwablah Attiogbe/Alameda County Flood Control District. The project is limited to widening the creek channel where feasible; meandering portions of the existing creek channel; creating low flow channels; removing and replacing existing culverts; removing and replacing pedestrian bridges and paths; replacing gabion walls with low retaining walls; and constructing berms and bank stabilization infrastructure. These improvements will improve flood conveyance and contain the 100-year design flow where possible.

Contact Information
Marcia Grefsrud
CDFW Bay Delta Region
7329 Silverado Trail
Napa, CA 94558

Phone : (707) 644-2812

Location

Coordinates
37°32'57.12"N 121°56'57.04"W
Cities
Fremont
Counties
Alameda
Cross Streets
Lemos Lane/Chiltern Drive
Zip
94539
Railways
SPRR, WPRR
Schools
Brier ES, CA
Waterways
Hetch Hetchy Aqueduct, Lake Elizabeth
Township
4S
Range
1W
Section
27
Base
MDB&M

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
CDFW Bay Delta Region, 7329 Silverado Trail, Napa, CA 94558

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search