Mission Creek Flood Control and Restoration Project (Lake or Streambed Alteration Agreement No. 1600-2014-0003-R3)

3 Documents in Project

Summary

SCH Number
2013102049
Lead Agency
Alameda County Water District (ACWD)
Document Title
Mission Creek Flood Control and Restoration Project (Lake or Streambed Alteration Agreement No. 1600-2014-0003-R3)
Document Type
NOD - Notice of Determination
Received
Posted
11/10/2014
Present Land Use
Park Open Space, O-S District
Document Description
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement number 1600-2014-0003-R3, pursuant to section 1602 of the Fish and Game Code to the project Applicant, Kwablah Attiogbe/Alameda County Flood Control District. The project is limited to widening the creek channel where feasible; meandering portions of the existing creek channel; creating low flow channels; removing and replacing existing culverts; removing and replacing pedestrian bridges and paths; replacing gabion walls with low retaining walls; and constructing berms and bank stabilization infrastructure. These improvements will improve flood conveyance and contain the 100-year design flow where possible.

Contact Information

Name
Marcia Grefsrud
Agency Name
CDFW Bay Delta Region
Contact Types
Lead/Public Agency

Location

Cities
Fremont
Counties
Alameda
Cross Streets
Lemos Lane/Chiltern Drive
Zip
94539
Railways
SPRR, WPRR
Schools
Brier ES, CA
Waterways
Hetch Hetchy Aqueduct, Lake Elizabeth
Township
4S
Range
1W
Section
27
Base
MDB&M

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print