Karuna LLC Master Plan, Subdivision Vesting Tentative Map and Precise Development Plan

2 Documents in Project

Summary

SCH Number
2013102008
Lead Agency
Marin County
Document Title
Karuna LLC Master Plan, Subdivision Vesting Tentative Map and Precise Development Plan
Document Type
NOD - Notice of Determination
Received

Document Description
Jerry Draper, on behalf of Karuna Land, LLC was approved for a Master Plan that allows the future subdivision of a 10.6-acre lot into six lots for residential development, plus one remainder parcel. Future development would entail the construction of six new single-family residences, as well as access, utility, family residences would each be approximately 1,500 square feet in size, and would be built in two groups of three in a row aligned along the east (uphill) side of the proposed driveway. Access would be from the end of Sacramento Avenue on a common private roadway and new driveway. A total of 9 residences at 11 and 58 Sacramento Avenue, and the second unit approved for the barn) would be served by the private roadway and common driveway. A new concrete box culvert/bridge with a natural bottom would replace the two existing 24-inch diameter concrete culverts for the common driveway crossing over the creek. Drainage improvements include bioswales along the driveway, and a portion of the driveway is proposed to construct of permeable materials.

Contact Information
Ben Berto
Marin County Com. Dev. Agency
3501 Civic Center Drive, Room 308
San Rafael, CA 94903

415 473 3658

Location

Coordinates
37°59'18.14"N 122°33'34.49"W
Cities
San Anselmo
Counties
Marin
Cross Streets
San Francisco Blvd and Sacramento Ave
Zip
94960
Total Acres
10.6
Parcel #
177-220-10
State Highways
Hwy 101

Notice of Determination

Approving Agency
Marin County
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
Marin County Community Development Agency 3501 Civic Center Drive, #308, San Rafael CA 94903

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search