Lake or Streambed Alteration Agreement (Agreement) No. 1600-2014-0078-R1, Culvert Replacement and Upgrade at Post Mile 2.43 on Route 1 Affecting an Unnamed Stre
4 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2013102005
- Lead Agency
- Caltrans 3 (Marysville) (California Department of Transportation, District 3)
- Document Title
- Lake or Streambed Alteration Agreement (Agreement) No. 1600-2014-0078-R1, Culvert Replacement and Upgrade at Post Mile 2.43 on Route 1 Affecting an Unnamed Stre
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 7/23/2014
- Present Land Use
- Rural Residential
- Document Description
- The Department of Fish and Wildlife (Department) is issuing an Agreement involving one encroachment: replace and upgrade an existing 30-inch culvert with a new 30-inch culvert and down-drain. The new culvert will be installed approximately 18 feet south of the existing culvert location. No dewatering is proposed as the new culvert will be installed while water is being conveyed by the existing culvert.
- Contact Information
-
Rick Macedo
CDFW Northern Region
601 Locust Street
Redding, CA 96001
Phone : (707) 928-4369
Location
- Coordinates
- 38°46'59.61"N 123°33'4.64"W
- Counties
- Mendocino
- Cross Streets
- Big Gulch Road & SR 1
- Zip
- 95445
- Total Acres
- >1
- State Highways
- Hwy 1
- Township
- 11N
- Range
- 15W
- Section
- 20
- Other Location Info
- Gualala
Notice of Determination
- Approving Agency
- CDFW
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- CDFW Northern Region 601 Locust Street Redding, Ca 96001
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.