San Gabriel Valley Water Company Groundwater Production Well Plant No. 11

3 Documents in Project

Summary

SCH Number
2013101094
Lead Agency
City of El Monte
Document Title
San Gabriel Valley Water Company Groundwater Production Well Plant No. 11
Document Type
NOD - Notice of Determination
Received
Posted
1/24/2014
Document Description
SGVWC is proposing this Project in order to have better water storage and production. Proposed improvements include a new water production well, grading and drainage improvements at its Plant No. 11 site. Plant No. 11 encompasses approximately 5.5 acres. Existing structures on the site include two steel water storage reservoirs with capacities of 400,000 gallons and 1.77 million gallons, respectively, one booster station building, two equipment storage buildings, an air stripper, electrical power equipment and electronic control equipment, three water production wells with associated piping and equipment, and underground pipelines. A 7-foot wrought iron fence and an associated 20-foot-wide wrought iron gate exist along the front of the site. A 6-foot-high chain link fence exists along the east, west and southerly property lines. The site is covered with crushed rock. All existing structures will remain.

Contact Information

Name
Ignacio Rincon
Agency Name
City of El Monte
Contact Types
Lead/Public Agency

Location

Cities
El Monte
Counties
Los Angeles
Cross Streets
Parkway Drive, Fineview Street, Silverbay Avenue
Zip
91732
Total Acres
5.5
State Highways
Hwy 10
Waterways
San Gabriel river
Township
1S
Range
11W
Base
SBB&M

Notice of Determination

Approving Agency
City of El Monte
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print