Griffith Park South Water Recycling Project
4 Documents in Project
Summary
SCH Number
2013101066
Lead Agency
Los Angeles Department of Water and Power
Document Title
Griffith Park South Water Recycling Project
Document Type
NOD - Notice of Determination
Received
Posted
3/24/2014
Present Land Use
Open Space (OS-1XL)
Document Description
Construction of 7,400 linear feet of pipelines, a recycled water pump station, and a recycled water storage tank with 1 million gallon capacity. 2,100 linear feet of a 12-inch pipeline would connect to an existing 8-inch recycled water pipeline southwest of Griffith Park Drive/Crystal Springs Drive. The pipeline would be installed within the existing roadway and connect north of and to the proposed recycled water pump station. The pipeline would continue for approximately 2,500 feet and would be installed using HDD construction method. 1,400 linear feet of 12-inch pipeline would be constructed to a new million gallon capacity recycled water storage tank.
Contact Information
Name
Irene Paul
Agency Name
Los Angeles Department of Water and Power
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Los Angeles, Los Angeles, City of
Counties
Los Angeles
Cross Streets
Crystal Springs Drive, Fire Road, Griffith Park Drive, Vista Del Valle Drive
Zip
90027
Total Acres
5.8
Parcel #
5593002906, 5593002905
State Highways
Hwy 5, 134
Railways
Metrolink / Amtrak
Schools
Los Feliz Nursery School and John Marshall HS
Waterways
Los Angeles River
Notice of Determination
Approving Agency
LADWP
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.