Shelter Island Boatyard Crane Replacement and Pier Addition Project

4 Documents in Project

Summary

SCH Number
2013101052
Lead Agency
San Diego Unified Port District
Document Title
Shelter Island Boatyard Crane Replacement and Pier Addition Project
Document Type
NOD - Notice of Determination
Received
Posted
4/23/2014
Present Land Use
Existing Shelter Island Boatyard Port Master Plan designations are Marine Sales/Service & Marine Services Berthing
Document Description
The San Diego Regional Water Quality Control Board is issuing a Clean Water Act Section 401 water quality certification (Certification No. R9-2013-0194) to the project applicant, Shelter Island Yachtways, Ltd. The project includes replacement of two exisitng gantry cranes with two new 70 and 150 ton capacity cranes; a new pier system to support the new larger crane; replacement of concretre slab; demolitionof small strucutres; repair of the exisitng bulkhead; 1,240sf of new piers, docks, and piles; removal of 1,247sf of exisitng docks.

Contact Information

Name
Lisa Honma
Agency Name
RWQCB - San Diego Region
Contact Types
Lead/Public Agency

Location

Cities
San Diego
Counties
San Diego
Cross Streets
Shelter Island Drive
Zip
92106
Parcel #
760-003-06-00
Airports
SD Int'l
Schools
Cabrillo ES
Waterways
San Diego Bay
Other Location Info
Point Loma

Notice of Determination

Approving Agency
RWQCB - San Diego Region
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print