SR-1 (PCH) at SR-107 Hawthorne Blvd Intersection Project

2 Documents in Project

Summary

SCH Number
2013101037
Lead Agency
City of Torrance
Document Title
SR-1 (PCH) at SR-107 Hawthorne Blvd Intersection Project
Document Type
NOD - Notice of Determination
Received
Posted
2/14/2014
Present Land Use
Commercial and Hawthorne Boulevard Corridor Specific Plan
Document Description
The project includes the addition of a left turn lanes to provide dual left-turn lanes and a right-turn pocket along both the eastbound and westbound no approaches along PCH. To accommodate proposed improvements the length of EB PCH to be widened is approximately 535 feet (ft.), and the length of WB PCH to be widened is approximately 600 ft. On south leg of Hawthorne Boulevard, a NB right turn lane onto EB PCH is proposed. The EB PCH approach is going to be widened from 37 to 65 ft. The EB PCH (east of Hawthorne) would be widened from 37 ft. to 42 ft. The NB Hawthorne approach would be widened from 40 to 52 ft. Additional improvements include striping/signage, traffic signal modification, drainage improvements, utility relocations, and the rehabilitation of the existing pavement. The project also involves the future consideration of the potential acquisition of any right-of-way necessary to install these improvements.

Contact Information

Name
Gregg D. Lodan
Agency Name
City of Torrance
Contact Types
Lead/Public Agency

Location

Cities
Torrance
Counties
Los Angeles
Cross Streets
PCH and Hawthorne
Zip
90503
State Highways
SR-1, 107
Airports
Torrance Municipal
Schools
Wallteria ES

Notice of Determination

Approving Agency
City of Torrance
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print