SR-1 (PCH) at SR-107 Hawthorne Blvd Intersection Project

2 Documents in Project

Summary

SCH Number
2013101037
Lead Agency
Torrance, City of (City of Torrance)
Document Title
SR-1 (PCH) at SR-107 Hawthorne Blvd Intersection Project
Document Type
NOD - Notice of Determination
Received

Document Description
The project includes the addition of a left turn lanes to provide dual left-turn lanes and a right-turn pocket along both the eastbound and westbound no approaches along PCH. To accommodate proposed improvements the length of EB PCH to be widened is approximately 535 feet (ft.), and the length of WB PCH to be widened is approximately 600 ft. On south leg of Hawthorne Boulevard, a NB right turn lane onto EB PCH is proposed. The EB PCH approach is going to be widened from 37 to 65 ft. The EB PCH (east of Hawthorne) would be widened from 37 ft. to 42 ft. The NB Hawthorne approach would be widened from 40 to 52 ft. Additional improvements include striping/signage, traffic signal modification, drainage improvements, utility relocations, and the rehabilitation of the existing pavement. The project also involves the future consideration of the potential acquisition of any right-of-way necessary to install these improvements.

Contact Information
Gregg D. Lodan
City of Torrance
3031 Torrance Boulevard
Torrance, CA 90503

310 618 5990

Location

Coordinates
33°48'18"N 118°21'3"W
Cities
Torrance
Counties
Los Angeles
Cross Streets
PCH and Hawthorne
Zip
90503
State Highways
SR-1, 107
Airports
Torrance Municipal
Schools
Wallteria ES

Notice of Determination

Approving Agency
City of Torrance
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
City of Torrance Community Development Department 3031 Torrance Boulevard, Torrance CA 90503

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A Statement of Overriding Considerations was adopted for this project
N/A
(5) Findings were made pursuant to the provisions of CEQA
N/A