Candlelight

5 Documents in Project

Summary

SCH Number
2013101036
Lead Agency
City of San Diego
Document Title
Candlelight
Document Type
NOD - Notice of Determination
Received
Posted
3/13/2024
Document Description
A Tentative Map Extension of Time and a Planned Development Permit (PDP) Amendment for the residential development portion of the project to reduce the total unit count and density by increasing the size of the multi-family residential units. The proposed PDP amendment would reduce the total residential unit count from 475 multi-family residences to 450 multi-family residences. The revised site plan for Lots 1, 2 and 3 would modify the arrangement of units and the residential unit type from 2-bedroom multi-family units to a mix of 2-, 3-, and 4- -bedroom multi-family units. The larger units would increase the size of the residential buildings and result in a 25-unit reduction in total count to 450 units across all three lots. The project is also proposing to incorporate 14 affordable housing units into the 450 units on site, in compliance with the inclusionary Housing Regulations of San Diego Municipal Code (SDMC) Chapter 14, Article 2, Division 13. All residential buildings would continue to be three stories in height and each unit would feature exterior usable open space. Both resident and guest parking would be provided at ratios that are in compliance with SDMC requirements. With the reduction in units, the residential density would decrease from above 20 du/ac to below 20 du/ac but remain consistent with the (15-29 du/ac) density range identified in the Otay Mesa Community Plan (OMCP). No changes to the originally proposed grading limits, open space preserves on Lots 4 and 5, access trail, trailhead and trail improvements and public road improvements are proposed.

Contact Information

Name
Jeff Szymanski
Agency Name
City of San Diego
Job Title
Senior Planner
Contact Types
Lead/Public Agency

Location

Cities
San Diego
Counties
San Diego
Regions
Citywide, Countywide
Other Information
A Tentative Map Extension of time and a Planned Development Permit

Notice of Determination

Approving Agency
City of San Diego
Approving Agency Role
Lead Agency
Approved On
County Clerk
San Diego
Final Environmental Document Available at
Development Services Department, 1222 First Avenue, MS-5021, San Diego, CA 92101

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print