PG&E Line 123 Replacement Project - City of Roseville

5 Documents in Project

Summary

SCH Number
2013092055
Lead Agency
City of Roseville
Document Title
PG&E Line 123 Replacement Project - City of Roseville
Document Type
NOD - Notice of Determination
Received
Posted
5/14/2014
Present Land Use
Various
Document Description
PG&E currently owns and operates Line 123, a natural gas pipeline that serves customers in PG&E's Sacramento and Sierra Divisions. As part of its Pipeline Safety and Enhancement Plan (PSEP), PG&E proposes to replace approximately 16,296 total linear feet (3.1 linear miles) of Line 123 located within the City of Roseville (City), Placer County, California. PG&E's PSEP program was developed to comply with California Public Utilities Commission Decision 11-06-017, which called for strength-testing or replacement of untested pipe. Accordingly, PG&E proposes to replace a portion of Line 123 as part of the PG&E Line 123 Pipeline Replacement Project (referred to here as the "the proposed project" or "the project"). The project proposes to new easements across City owned property to facilitate replacement of the existing 12-inch diameter steel pipe with a 16-inch diameter pipe utilizing horizontal directional drilling (HDD), jack-and-bore, and open-trench constructions techniques. Construction would occur in two phases. Phase 1 construction would begin upon Council approval through summer 2014. Phase 1 would include the entire length of pipeline within Roseville with the exception of approximately 2,000 lineal feet located with a preserve area 1,400 feet north of and 600 feet south of Pleasant Grove Boulevard which comprises the Phase 2 segment. Work within the Woodcreek Oaks Golf Course is currently targeting a two week period between August 18 and August 28, 2014. Timing of Phase 2 construction has not been identified.

Contact Information

Name
Mark Morse
Agency Name
City of Roseville
Contact Types
Lead/Public Agency

Location

Cities
Roseville
Counties
Placer
Cross Streets
Blue Oaks Boulevard and Baseline Road
Zip
95747
Total Acres
32
State Highways
SR 65
Railways
UPRR
Schools
Various
Waterways
Dry Creek

Notice of Determination

Approving Agency
Roseville City Council
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A