Rezone and General Plan Amendment
3 Documents in Project
Summary
SCH Number
2013092054
Lead Agency
Lassen County
Document Title
Rezone and General Plan Amendment
Document Type
NOD - Notice of Determination
Received
Posted
11/19/2014
Present Land Use
Vacant / A-2-B-10 (Agricultural Residential), 10 acre Building Site Combining District)/ Agricultural Residential
Document Description
Proposal to rezone the identified parcel from A-2-B-10-PSA (Agricultural Residential, 10 acre Building Site and Public Safety Airport Combining Districts) to C-T-PSA (Town Service, Public Safety Airport Combining District). An amendment of the current "Rural Residential" land use designation to "Town Center" is required to maintain consistency with the proposed zoning district. A mini-storage facility will be proposed if the rezone is approved. The mini-storage is a ministerial project that is allowed by right in the C-T zoning district. The rezone would also potentially allow additional uses by right. Said uses are enumerated at Section 18.34.030 of the Lassen County Code.
Contact Information
Name
Maurice L. Anderson
Agency Name
Lassen County
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Counties
Lassen
Cross Streets
739-200 Herlong Access Road, in Herlong
Zip
96113
Total Acres
10.02
Parcel #
131-090-40, 44
State Highways
Hwy 395
Airports
Herlong
Township
26
Range
15
Section
5
Base
MDB&M
Other Location Info
Herlong
Notice of Determination
Approving Agency
Lassen County
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.