UCSF Parnassus Heights Central Utility Plant Diesel Tanks Replacement

19 Documents in Project

Summary

SCH Number
2013092047
Lead Agency
Regents of the University of California
Document Title
UCSF Parnassus Heights Central Utility Plant Diesel Tanks Replacement
Document Type
NOD - Notice of Determination
Received
Posted
6/8/2016
Present Land Use
Multiple
Document Description
The UCSF proposes to replace five existing 30,000 gallon underground diesel storage tanks located in Medical Center Way at the Parnassus Heights campus site. The proposed new replacement tanks would be located in the same location as the current tanks and would be the same size. The underground pump discharge and manifold would be replaced as well as the fuel line. The closure of Medical Center Way to traffic between the project site and the Environmental Health & Safety (EH&S) building would be required for approx. 6 to 8 months. Consequently, there would be no vehicular access from Parnassus Avenue via Medical Center Way to EH&S, Surge, Woods, Aldea Housing or the Aldea Community Center. Vehicle access to these locations would be via city streets - Clarendon Avenue and Johnson Drive. The proposed project is consistent with the UCSF 2014 Long Range Development Plan.

Contact Information

Name
Diane Wong
Agency Name
University of California
Contact Types
Lead/Public Agency

Location

Cities
San Francisco
Counties
San Francisco
Cross Streets
Multiple
Parcel #
Multiple
State Highways
Hwy 101, 280
Railways
Caltrain
Airports
No
Schools
Multiple
Waterways
San Francisco Bay

Notice of Determination

Approving Agency
University of California
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print