UCSF Mission Bay East Campus Phase 2 (Block 34) Clinical Building and Parking Garage, UCSF Mission Bay Campus Site
18 Documents in Project
Download CSV
Download All Attachments
New Search
Print
Summary
- SCH Number
- 2013092047
- Lead Agency
- University of California
- Document Title
- UCSF Mission Bay East Campus Phase 2 (Block 34) Clinical Building and Parking Garage, UCSF Mission Bay Campus Site
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 3/18/2021
- Document Description
- The proposed project includes the construction a new, approximately 182,800-gross-square-foot Clinical Building and a new 500-space Parking Garage on the East Campus Phase 2 parcel (Block 34) at the Mission Bay campus site.
- Contact Information
-
Brian Harrington
University of California
Lead/Public Agency / Project Applicant
1111 Franklin Street
Oakland, CA 94607
Phone : (510) 587-6116
Brian.Harrington@ucop.edu
Location
- Cities
- San Francisco
- Counties
- San Francisco
- Other Information
- The Mission Bay East Campus (which contains both Blocks 33 and 34) is bounded by Third Street to the west, 16th Street to the north, Illinois Street to the east, and Mariposa Street to the south. The proposed project site is Block 34, south of the Wayne and Gladys Valley Center for Vision building
Notice of Determination
- Approving Agency
- University of California
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- https://www.ucsf.edu/cphp/community and University of California San Francisco Campus Planning, 654 Minnesota Street, 2nd Floor, 94143-0286, Attn: Principal Planner, Diane Wong (415) 502-5952.
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- No
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- Yes (Addendum #5 to the UCSF 2014 Long Range Development Plan Environmental Impact Report)
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- No
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Attachments
- Notice of Determination
- SF DFW Receipt 2014 PDF 60 K SF_Block 34 NOD_Signed PDF 139 K
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.