UCSF Mission Bay 2nd Parcel Infrastructure

19 Documents in Project

Summary

SCH Number
2013092047
Lead Agency
Regents of the University of California
Document Title
UCSF Mission Bay 2nd Parcel Infrastructure
Document Type
NOD - Notice of Determination
Received
Posted
9/26/2016
Present Land Use
Multiple
Document Description
The UCSF proposes to construct wet utility infrastructure piping and appurtenances including fire water, domestic water, reclaimed water, storm drainage and sanitary sewerage at the UCSF Mission Bay campus site northwest parcels in and adjacent to Blocks 14, 15, 16 and 18. The scope of work also includes surface improvements in these areas: electrical power and telecommunications, streets and sidewalks, street lighting, and temporary construction trailers. The proposed project si consistent with the UCSF 2014 Long Range Development Plan.

Contact Information

Name
Diane Wong
Agency Name
University of California
Contact Types
Lead/Public Agency

Location

Cities
San Francisco
Counties
San Francisco
Cross Streets
Multiple
Parcel #
Multiple
State Highways
Hwy 101, 280
Railways
Caltrain
Airports
No
Schools
Multiple
Waterways
San Francisco Bay

Notice of Determination

Approving Agency
University of California
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print