Sharp Park Safety, Infrastructure Improvement, and Habitat Enhancement Project
3 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2013092042
- Lead Agency
- City and County of San Francisco
- Document Title
- Sharp Park Safety, Infrastructure Improvement, and Habitat Enhancement Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 4/3/2014
- Document Description
- The proposed project consists of: 1) construction of a perennial pond, approximately 1,600 sf in size, located approximately 400 to 500 feet southeast of Horse Stable Pond (HSP); 2) realignment of a portion of an existing golf cart path located west of the fairway for golf course hole number 14 and east of the tee box for golf course hole number 15; 3) removal of sediment and emergent vegetation within HSP and the connecting channel that links HSP and Laguna Salada (LS); 4) construction of a maintenance walkway approximately 4.6 feet in width at the existing HSP pumphouse; 5) replacement of a wooden retaining wall near the pumphouse with a concrete retaining wall at the existing PSP pumphouse; and 6) construction of steps from the access road to the existing HSP pumphouse.
- Contact Information
-
Kei Zushi
City and County of San Francisco
Lead/Public Agency
1650 Mission Street, Suite 400
San Francisco, CA 94103
Phone : (415) 575-9036
kei.zushi@sfgov.org
Location
- Coordinates
- 37°37'57"N 122°29'8"W
- Cities
- Pacifica
- Counties
- San Mateo
- State Highways
- Hwy 1
Notice of Determination
- Approving Agency
- City and County of San Francisco
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- Recreation and Park Department, Mclaren Lodge-Golden Gate Park, 501 Stanyan St., San Francisco Ca 94117
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- N/A
- (6) Findings were made pursuant to the provisions of CEQA
- N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.