Sharp Park Safety, Infrastructure Improvement, and Habitat Enhancement Project

3 Documents in Project

Summary

SCH Number
2013092042
Lead Agency
San Francisco, City and County of (City and County of San Francisco)
Document Title
Sharp Park Safety, Infrastructure Improvement, and Habitat Enhancement Project
Document Type
NOD - Notice of Determination
Received

Document Description
The proposed project consists of: 1) construction of a perennial pond, approximately 1,600 sf in size, located approximately 400 to 500 feet southeast of Horse Stable Pond (HSP); 2) realignment of a portion of an existing golf cart path located west of the fairway for golf course hole number 14 and east of the tee box for golf course hole number 15; 3) removal of sediment and emergent vegetation within HSP and the connecting channel that links HSP and Laguna Salada (LS); 4) construction of a maintenance walkway approximately 4.6 feet in width at the existing HSP pumphouse; 5) replacement of a wooden retaining wall near the pumphouse with a concrete retaining wall at the existing PSP pumphouse; and 6) construction of steps from the access road to the existing HSP pumphouse.

Contact Information
Kei Zushi
City and County of San Francisco
1650 Mission Street, Suite 400
San Francisco, CA 94103

415 575 9036
kei.zushi@sfgov.org

Location

Coordinates
37°37'57"N 122°29'8"W
Cities
Pacifica
Counties
San Mateo
State Highways
Hwy 1

Notice of Determination

Approving Agency
City and County of San Francisco
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
Recreation and Park Department, Mclaren Lodge-Golden Gate Park, 501 Stanyan St., San Francisco Ca 94117

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
N/A
(5) Findings were made pursuant to the provisions of CEQA
N/A
Download CSV New Search