US 101/Willow Road Interchange Reconstruction Project

3 Documents in Project

Summary

SCH Number
2013092019
Lead Agency
California Department of Transportation, District 4
Document Title
US 101/Willow Road Interchange Reconstruction Project
Document Type
NOD - Notice of Determination
Received
Posted
12/6/2013
Present Land Use
Public right of way for transportation - access-controlled freeway and local street
Document Description
The project proposes to reconstruct the existing United States 101 / Willow Road (also known as SR 114) Interchange on its existing alignment to a partial cloverleaf interchange. Other components include: Reconstruct the Willow Road overcrossing to provide eight lanes, dedicated bicycle lanes, sidewalks and a standard vertical clearance; Realign and widen the diagonal off-ramps from US 101 to Willow Road to provide additional storage; Construct signalized intersections at the realigned diagonal off-ramp terminals; Realign and widen the diagonal on-ramps to provide High Occupancy Vehicle bypass lanes, and in conjunction with the modification of existing ramp metering system; Modify and realign the frontage roads adjacent to the overcrossing; Reconstruct portions of existing soundwalls; and Construct retaining walls.

Contact Information

Name
Yolanda Rivas
Agency Name
California Department of Transportation, District 4
Contact Types
Lead/Public Agency

Location

Cities
East Palo Alto, Menlo Park
Counties
San Mateo
Cross Streets
US 101, Willow Road (SR 114), Bay Road
Zip
94025

Notice of Determination

Approving Agency
California Department Transportation
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.