Anzerson Springs Septic to Sewer Project (Lake or Streambed Alteration Agreement No. 1600-2017-0252-R2)

6 Documents in Project

Summary

SCH Number
2013092015
Lead Agency
Lake County
Document Title
Anzerson Springs Septic to Sewer Project (Lake or Streambed Alteration Agreement No. 1600-2017-0252-R2)
Document Type
NOD - Notice of Determination
Received
Posted
11/8/2017
Present Land Use
R1/LDR
Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2017-0252-R2, pursuant to section 1602 of the Fish and Game Code to the project Applicant, Lake County Sanitation District. Project is limited to the installation of a sewer main at approx. 5 bridge crossings and 49 culvert crossings on unnamed tributaries to Anderson and Putah Creeks. The sewer main will be installed one of three ways at each crossing: 1) mounted to the downstream side of the bridge crossings in a protective casing 2) placed beneath the culvert crossings by trenching 3) placed beneath the culvert crossings by directionally drilling. The diameter of the sewer main pipe to be installed ranges from 1.25 to 6 inches.

Contact Information

Name
Kelsey Vella
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Counties
Lake
Cross Streets
Hwy 175, Anderson Springs Rd
Zip
95461
Parcel #
mult
State Highways
Hwy 175
Waterways
Anderson, Putah Creeks
Township
11N
Range
8W
Section
25
Base
MDB&M
Other Location Info
Middletown

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print