- Document Description
- Bogle Vineyards request approval of a Use Permit, Variance, and Flood Hazard Development Permit to construct a simple large (1.6 megawatt generating) wind turbine at its wine production facility near the town of Clarksburg. The wind turbine will be located adjacent to the wastewater ponds used by the facility, within a fenced 2, 5000-square foot graveled area. The 1.6MW turbine will be approximately 263 feet in height (main shaft of the turbine) and 398 feet high with the blade in the twelve o'clock position. Bogie Vineyards will use the power the turbine generates for its production facility and will send any excess power to back feed the PG&E grid. All transmission lines will be placed underground.
- Contact Information
-
Eric Parfrey
Yolo County Planning and Public Works
Lead/Public Agency
292 W. Beamer Street
Woodland, CA 95695
Phone : (530) 666-8043
Location
- Coordinates
- 38°22'55"N 121°35'43"W
- Counties
- Yolo
- Cross Streets
- 49762 Hamilton Road at Jefferson Blvd (Route 84)
- Zip
- 95612
- Total Acres
- 60
- Parcel #
- 043-310-012
- State Highways
- Hwy 84
- Waterways
- Sacramento Ship Channel
- Township
- 6N
- Range
- 3E
- Section
- 1
- Base
- MDB&M
- Other Location Info
- Clarksburg
Notice of Determination
- Approving Agency
- Yolo County Board of Supervisors
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- 292 West Beamer Street, Woodland CA
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- N/A
- (6) Findings were made pursuant to the provisions of CEQA
- N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.