Lower Paseo Privado Water Storage Tank Replacement and Operation Project

2 Documents in Project

Summary

SCH Number
2013091089
Lead Agency
Monterey County
Document Title
Lower Paseo Privado Water Storage Tank Replacement and Operation Project
Document Type
NOD - Notice of Determination
Received
Posted
3/23/2018
Present Land Use
Water Storage / O / B-8-VS Open Space, Building Site overlay, Visually Sensitive district

Document Description
SWRCB, as the responsible agency, will be issuing a water supply permit. The CalAm Water Company Amber Park proposed project includes replacing two existing 55,000 gallon water storage tanks with two 200,000 gallon water storage tanks to meet current maximum daily demands and fire protection. The 21 foot high tanks will be equipped with a float switch alarm system and pressure transducer to monitor water levels and connected to a SCADA system to communicate with the pump station that fills the tank. A 120 sq. ft. retaining wall will be built. A temporary tank will be placed on site during construction for 6-9 months while the permanent tanks are under construction. The project is within a visual sensitivity zoning district and will remove one 8 foot and one 20 foot oak tree. The project will extend the current easement the tanks fall within by 3,485 ft.

Contact Information
Jan Sweigert
SWRCB
1 Lower Ragsdale Dr., Buildnt 1, Suite 120
Monterey, CA 93940

Phone : (831) 655-6939

Location

Cities
Monterey
Counties
Monterey
Cross Streets
Paseo Privado Road
Zip
93902
Total Acres
15
Parcel #
161-211-013-000
State Highways
Hwy 68
Schools
Salinas
Waterways
Salinas River

Notice of Determination

Approving Agency
SWRCB
Approving Agency Role
Responsible Agency
Approved On
Final Environmental Document Available at
1 Lower Ragsdale Dr., Bldg. 1, Suite 210, Monterey, CA 93940

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search