Approve the Campus Master Plan Revision for the Student Housing South Project

4 Documents in Project

Summary

SCH Number
2013091085
Lead Agency
California State Polytechnic University, San Luis Obispo
Document Title
Approve the Campus Master Plan Revision for the Student Housing South Project
Document Type
NOD - Notice of Determination
Received

Document Description
The proposed revision to the campus master plan revision for the Student Housing South project combines and relocates the four planned student housing facilities to the existing Parking Lots G-1 and R-2 on a 12 acre site at the corner of Slack Street and Grand Avenue in the southeast portion of the campus. Project will provide approximately 1,475 beds in seven residence halls (three- to five- stories) totaling approximately 525,000 gross square feet (GSF). A new parking structure will be situated on the northern end of the site with primary access off Grand Avenue via the existing access road to Parking Lot g-1. The parking structure will be a maximum of four stories, with on to two stories below grade, and surrounded by a visitor's center, cafe, student gathering spaces, housing and residential life staff offices, and a community mail room.

Contact Information
Joel Neel
California State Polytechnic University, San Luis Obispo
401 Golden Shore
Long Beach, CA 90802-4210

(805) 756-2193

Location

Coordinates
35°17'49.2"N 120°39'17"W
Cities
San Luis Obispo
Counties
San Luis Obispo
Cross Streets
Grand Avenue and Slack Street
Zip
93407
Total Acres
12
State Highways
Hwy 101, 1
Railways
UPRR
Airports
No
Schools
Former Pacheco ES
Waterways
Stenner Creek, Brizzolara Creek
Township
23
Range
12E
Section
30S

Notice of Determination

Approving Agency
Trustees
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
401 Golden Shore, Long Beach, CA 90802-4210.

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
Yes
(5) Findings were made pursuant to the provisions of CEQA
Yes