San Luis Rey Mitigation Bank Project
4 Documents in Project
Summary
SCH Number
2013091081
Lead Agency
City of Oceanside
Document Title
San Luis Rey Mitigation Bank Project
Document Type
NOD - Notice of Determination
Received
Posted
8/21/2014
Present Land Use
GP: Agriculture (A) and Residential Estates B (EB-R).
Z: Agriculture (A) and Agriculture-Equestrian Overlay
Document Description
The Applicant proposes to create, operate, and maintain the San Luis Rey Mitigation Bank (Mitigation Bank) pursuant to a federal and State approved bank enabling instrument (BEI). The Mitigation Bank will re-establish, rehabilitate, and permanently protect at least 45.25 acres of riparian wetland waters and approximately 8.59 acres of riparian floodplain and upland buffer habitats in the San Luis Rey River streambed and banks. The project area includes the Restoration Area (approximately 56 acres) and 5 Soil Placement Sites (approximately 93 acres), for a total project area of approximately 150 acres located north of Mission Avenue I SR76 and east of Melrose Drive.
Contact Information
Name
David Gibson
Agency Name
RWQCB - San Diego Region
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Oceanside
Counties
San Diego
Cross Streets
Highway 76 / Singh Way
Zip
92054
Total Acres
150
Parcel #
122-130-022 - 027, 157-150-060
State Highways
Hwy 76
Airports
Oceanside Municipal
Schools
Mission Vista HS
Waterways
San Luis Rey River
Township
11S
Range
4W
Section
1
Notice of Determination
Approving Agency
Regional Water Quality Control Board - San Diego Region
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.