Stockdale Integrated Banking Project

6 Documents in Project

Summary

SCH Number
2013091076
Lead Agency
Rosedale-Rio Bravo Water Storage District
Document Title
Stockdale Integrated Banking Project
Document Type
NOD - Notice of Determination
Received
Posted
12/16/2015
Present Land Use
Stockdale East - Intensive Agriculture; Exclusive Agriculture. Stockdale West - Intensive Agriculture; Exclusive Agriculture.
Document Description
The Rosedale-Rio Bravo Water Storage District, as the Lead Agency, in consultation with the Irvine Ranch Water District (IRWD), as the Responsible Agency, proposes the Stockdale Integrated Banking Project. The proposed project would be located on three properties in the vicinity of Stockdale Highway and Enos Lane (Hwy 43). The proposed project would develop groundwater banking facilities, including recharge basins and groundwater production wells, on the three properties. The proposed project would augment the recharge and extraction capacity of Rosedale's existing Conjunctive Use Program and provide greater operational flexibility. The proposed project would also enhance water supply reliability for IRWD by providing contingency storage to augment supplies during dry-year periods when other supply sources may be limited or not available.

Contact Information

Name
Paul Weghorst
Agency Name
Irvine Ranch Water District
Contact Types
Lead/Public Agency

Location

Counties
Kern
Cross Streets
Stockdale Hwy & Enos Lane (Hwy 43)
Zip
93312
State Highways
Hwy 58, 43, 119
Railways
Santa Fe Railroad
Waterways
Kern River, Cross Valley Canal, Pioneer Canal
Other Location Info
Rosedale

Notice of Determination

Approving Agency
Irvine Ranch Water District
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print