Atascadero State Hospital Solar Project

2 Documents in Project

Summary

SCH Number
2013091041
Lead Agency
Department of General Services (DGS)
Document Title
Atascadero State Hospital Solar Project
Document Type
NOD - Notice of Determination
Received
Posted
10/29/2013
Present Land Use
State Hospital/Public Zone/ Public Facilities
Document Description
The Proposed Project is a solar PV power generation system for the ASH that would be located on approximately 6.76 acres. The site corresponds to an unsectioned portion of the Rancho Atascadero Land Grant within the "Atascadero, CA" 7.5-minute quadrangle. The solar array would convert incident sunlight to direct current (DC) electrical power which would then be converted to alternating current (AC) by two centrally-located inverters before being delivered to the ASH-owned distribution system. The solar array would be configured into two distinct power blocks, identified as System 1 and System 2. System 1 power block would cover approximately 3.08 acres and is located on the northern portion of ASH property. System 2 power blocks would cover approximately 3.68 acres and is located approximately 59 feet south of System 1.

Contact Information

Name
Jennifer Parson
Agency Name
Department of General Services, RESD, PSB
Contact Types
Lead/Public Agency

Location

Cities
Atascadero
Counties
San Luis Obispo
Cross Streets
El Camino Real, San Rafael Road
Zip
93422
Total Acres
7
Parcel #
045-461-002
State Highways
US Route 101
Railways
SPRR
Schools
Santa Rosa Road Academy
Waterways
Salinas River
Township
28S
Range
12E
Base
MDB&M

Notice of Determination

Approving Agency
Calfornia Department of General Services
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.