Laguna Beach Water Tank Burn Site Remediation and Restoration Project
5 Documents in Project
Summary
SCH Number
2013091032
Lead Agency
City of Laguna Beach
Document Title
Laguna Beach Water Tank Burn Site Remediation and Restoration Project
Document Type
NOD - Notice of Determination
Received
Posted
8/14/2014
Present Land Use
LU: Vacant;
Z: Laguna Canyon Annexation Area Specific Plan (Open Space/Passive); GPD: Permanent Open Space/Open Space
Document Description
Construction of single-family houses on 93.5 acres. The development includes 206 residential lots, associated infrastructure and utilities, a sewer lift station, parks and open space, and stream channel impacts. Stream channel impacts include lowering and widening of the existing channel, a combination of earthen and hardened side slopes, access roads, and maintenance ramps. Additionally, two roadway crossings will be constructed for traffic circulation. These crossings consist of a double 10 by 4 foot box culvert at Cebalo Street, and two double 10 by 4 foot box culverts at Woolpert Lane.
Contact Information
Name
Darren Bradford
Agency Name
RWQCB - San Diego Region
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Laguna Beach
Counties
Orange
Cross Streets
Laguna Canyon Road/Phillips Road
Zip
92651
Total Acres
5.9
Parcel #
629-031-03, 629-031-23
State Highways
SR-133
Notice of Determination
Approving Agency
RWQCB - San Diego Region
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.